← Back to map

Juniper Solar (FL)

Pasco County, Florida · EIA plant ID 65683 · Operator: Tampa Electric Co
SolarSolar PhotovoltaicBA: TEC
Nameplate70MWSummer 70 MW
Generators1in service
Net generation143GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202723.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20235.811.2%—
2024146.923.9%—
2025147.824.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV7070Dec 2023Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%70 MW

Nearby plants

Within 80 km.
LKL BLBD, LLC6 MW18.6 km
Winston50 MW21.9 km
Lakeland Electric Co. (FL) - Airport II4 MW23.7 km
Lakeland Electric Co. (FL)-Airport 12 MW23.9 km
Goldfinch3 MW24.8 km
Mountain View Solar (FL)55 MW25.1 km