← Back to map

LKL BLBD, LLC

Polk County, Florida · EIA plant ID 59611 · Operator: LKL BLBD, LLC
SolarSolar PhotovoltaicBA: FMPP
Nameplate6MWSummer 6 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202619.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20154.420.1%—
201610.620.2%—
201711.421.6%—
201810.720.3%—
201911.121.0%—
20209.718.4%—
2021917.2%—
20229.918.9%—
20238.115.4%—
20248.916.8%—
20259.819.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LKLBBSolar PhotovoltaicPV65.8Aug 2015Operating—coming soon

Owner / operator

Operator: LKL BLBD, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
LKL BLBD, LLC100.0%6 MW

Nearby plants

Within 80 km.
Winston50 MW4.3 km
Lakeland Electric Co. (FL) - Airport II4 MW8.9 km
Lakeland Electric Co. (FL)-Airport 12 MW9.1 km
C D McIntosh Jr666 MW9.4 km
Goldfinch3 MW9.7 km
English Creek Solar23 MW14.3 km