Lakeland Electric Co. (FL) - Airport II
Polk County, Florida · EIA plant ID 59754 · Operator: Sun E N7 Holdings LLC
Nameplate4MWSummer 4 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor10%solar units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 6 | 18.0% | — |
| 2016 | 6.1 | 19.7% | — |
| 2020 | 9.7 | 31.5% | — |
| 2021 | 9 | 29.4% | — |
| 2024 | 2.2 | 7.2% | — |
| 2025 | 2.9 | 9.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 3.5 | 3.5 | Sep 2012 | Operating | — | coming soon |
Owner / operator
Operator: Sun E N7 Holdings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sun E N7 Holdings LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Lakeland Electric Co. (FL)-Airport 1 | 2 MW | 0.3 km |
| Goldfinch | 3 MW | 1.1 km |
| Winston | 50 MW | 5 km |
| English Creek Solar | 23 MW | 5.4 km |
| Laurel Oaks Solar | 61 MW | 7.4 km |
| Magnolia Solar | 75 MW | 8.2 km |