← Back to map

Lakeland Electric Co. (FL)-Airport 1

Polk County, Florida · EIA plant ID 59744 · Operator: SunE W12DG-B, LLC
SolarSolar PhotovoltaicBA: TEC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202611.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20154.217.6%—
20168.435.5%—
20171.97.8%—
20183.313.9%—
20194.418.8%—
20203.213.6%—
20212.210.9%—
20222.110.2%—
202329.8%—
20242.411.8%—
20252.311.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2.32.3Dec 2011Operating—coming soon

Owner / operator

Operator: SunE W12DG-B, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunE W12DG-B, LLC100.0%2 MW

Nearby plants

Within 80 km.
Lakeland Electric Co. (FL) - Airport II4 MW0.3 km
Goldfinch3 MW0.9 km
English Creek Solar23 MW5.1 km
Winston50 MW5.3 km
Laurel Oaks Solar61 MW7.1 km
Magnolia Solar75 MW7.9 km