C D McIntosh Jr
Polk County, Florida · EIA plant ID 676 · Operator: City of Lakeland - (FL)
×490 MW coal retired since 2020 (latest Apr 2021)
Nameplate666MWSummer 613 MW
Generators12in service
Net generation2,489GWh12 mo to Aug 2026
Capacity factor35%gas/coal/oil units, summer MW
Heat rate7,376Btu/kWhfossil units, electric fuel, HHV
First online1970Runs as intermediate
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 3,449.7 | — | — |
| 2002 | 4,065.2 | — | — |
| 2003 | 4,271.3 | 55.4% | 9,323 |
| 2004 | 3,594.1 | 46.6% | 9,031 |
| 2005 | 3,431.8 | 44.6% | 9,969 |
| 2006 | 3,423.2 | 44.9% | 9,824 |
| 2007 | 4,003.1 | 52.9% | 9,511 |
| 2008 | 3,432 | 44.9% | 9,907 |
| 2009 | 3,129.3 | 41.0% | 9,166 |
| 2010 | 3,081.9 | 40.2% | 8,919 |
| 2011 | 3,669.9 | 47.0% | 8,484 |
| 2012 | 3,697.2 | 47.2% | 8,434 |
| 2013 | 3,329.2 | 42.6% | 8,719 |
| 2014 | 2,201.6 | 28.2% | 8,252 |
| 2015 | 3,478.8 | 44.9% | 8,928 |
| 2016 | 3,151.6 | 44.5% | 9,116 |
| 2017 | 2,890 | 40.9% | 9,287 |
| 2018 | 3,804.4 | 53.8% | 8,955 |
| 2019 | 3,146.8 | 44.5% | 8,655 |
| 2020 | 2,585.3 | 34.8% | 8,536 |
| 2021 | 2,495.5 | 48.9% | 8,061 |
| 2022 | 2,349.9 | 54.4% | 7,204 |
| 2023 | 1,752.6 | 40.5% | 7,282 |
| 2024 | 2,344.7 | 53.5% | 7,432 |
| 2025 | 1,800.4 | 33.5% | 7,406 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo46,884 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas133
Net summer MW on oil128
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 5CT | Natural Gas Fired Combined Cycle | CT | 249 | 234 | May 2001 | Operating | — | coming soon |
| 5ST | Natural Gas Fired Combined Cycle | CA | 135 | 118 | Oct 2002 | Operating | — | coming soon |
| GT1 | Natural Gas Fired Combustion Turbine | GT | 26.6 | 18 | May 1973 | Operating | — | coming soon |
| GT2 | Natural Gas Fired Combustion Turbine | GT | 130 | 119.5 | Jun 2020 | Operating | — | coming soon |
| IC1 | Petroleum Liquids | IC | 2.5 | 2.5 | Jan 1970 | Operating | — | coming soon |
| IC2 | Petroleum Liquids | IC | 2.5 | 2.5 | Jan 1970 | Operating | — | coming soon |
| IC3 | Natural Gas Internal Combustion Engine | IC | 20 | 19.8 | Jan 2025 | Operating | — | coming soon |
| IC4 | Natural Gas Internal Combustion Engine | IC | 20 | 19.8 | Jan 2025 | Operating | — | coming soon |
| IC5 | Natural Gas Internal Combustion Engine | IC | 20 | 19.8 | Jan 2025 | Operating | — | coming soon |
| IC6 | Natural Gas Internal Combustion Engine | IC | 20.3 | 19.8 | Dec 2024 | Operating | — | coming soon |
| IC7 | Natural Gas Internal Combustion Engine | IC | 20.3 | 19.8 | Dec 2024 | Operating | — | coming soon |
| IC8 | Natural Gas Internal Combustion Engine | IC | 20.3 | 19.8 | Dec 2024 | Operating | — | coming soon |
| 1 | — | ST | 103.5 | 87 | Feb 1971 | not_current | — | coming soon |
| 2 | — | ST | 126 | 106 | Jun 1976 | not_current | — | coming soon |
| 3 | Conventional Steam Coal | ST | 363.8 | 342 | Sep 1982 | Retired Apr 2021 | — | coming soon |
| ST1 | Natural Gas Steam Turbine | ST | 103.5 | 85 | Feb 1971 | Retired Dec 2015 | — | coming soon |
| ST2 | Natural Gas Steam Turbine | ST | 126 | 106 | Jun 1976 | Retired Jun 2020 | — | coming soon |
Owner / operator
Operator: City of Lakeland - (FL). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Lakeland - (FL) | 100.0% | 667 MW |
Nearby plants
Within 80 km.
| LKL BLBD, LLC | 6 MW | 9.4 km |
| Winston | 50 MW | 10.9 km |
| Pace Road Battery Storage | — | 11.1 km |
| Osprey Energy Center Power Plant | 644 MW | 11.7 km |
| Cutrale Citrus Juices USA II | 8 MW | 12.6 km |
| Lakeland Electric Co. (FL) - Airport II | 4 MW | 15.7 km |