Nameplate644MWSummer 616 MW
Generators3in service
Net generation3,355GWh12 mo to Aug 2026
Capacity factor62%gas/coal/oil units, summer MW
Heat rate7,193Btu/kWhfossil units, electric fuel, HHV
First online2004Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2004 | 1,441.7 | 41.0% | 7,317 |
| 2005 | 1,731.5 | 33.1% | 7,400 |
| 2006 | 1,898.5 | 36.4% | 7,393 |
| 2007 | 2,228.8 | 42.8% | 7,336 |
| 2008 | 2,060 | 39.4% | 7,420 |
| 2009 | 2,478.3 | 47.5% | 7,279 |
| 2010 | 2,155.1 | 41.7% | 7,361 |
| 2011 | 2,444.4 | 47.3% | 7,360 |
| 2012 | 3,127.9 | 60.4% | 7,262 |
| 2013 | 2,679.7 | 51.8% | 7,330 |
| 2014 | 1,389.9 | 26.9% | 7,547 |
| 2015 | 2,058.7 | 39.8% | 7,487 |
| 2016 | 2,953.9 | 57.0% | 7,285 |
| 2017 | 1,801.1 | 35.3% | 7,338 |
| 2018 | 1,982.4 | 38.9% | 7,350 |
| 2019 | 2,214.2 | 43.4% | 7,286 |
| 2020 | 2,369.7 | 49.7% | 7,351 |
| 2021 | 2,420.4 | 48.0% | 7,282 |
| 2022 | 1,889.3 | 37.4% | 7,310 |
| 2023 | 2,114.1 | 40.2% | 7,477 |
| 2024 | 3,131.1 | 57.9% | 7,310 |
| 2025 | 3,651.2 | 67.7% | 7,194 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| OEC1 | Natural Gas Fired Combined Cycle | CT | 192.1 | 186 | May 2004 | Operating | — | coming soon |
| OEC2 | Natural Gas Fired Combined Cycle | CT | 192.1 | 188 | May 2004 | Operating | — | coming soon |
| OECS | Natural Gas Fired Combined Cycle | CA | 260 | 242 | May 2004 | Operating | — | coming soon |
Owner / operator
Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Florida, Inc | 100.0% | 644 MW |
Nearby plants
Within 80 km.
| Cutrale Citrus Juices USA II | 8 MW | 1 km |
| Pace Road Battery Storage | — | 9.5 km |
| C D McIntosh Jr | 666 MW | 11.7 km |
| Legoland Solar | 1 MW | 13.7 km |
| Bartow Solar Energy LLC | 7 MW | 14.1 km |
| Peace Creek Solar | 55 MW | 15.5 km |