Mountain View Solar (FL)

Pasco County, Florida · EIA plant ID 61664 · Operator: Tampa Electric Co
SolarSolar PhotovoltaicBA: TEC
Nameplate55MWSummer 55 MW
Generators1in service
Net generation100GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202720.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202272.420.1%—
202390.218.9%—
2024104.521.8%—
2025102.521.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV54.654.6Apr 2022Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%55 MW

Nearby plants

Within 80 km.
Juniper Solar (FL)70 MW25.1 km
Rattler Solar Plant75 MW26.9 km
Pasco Cnty Solid Waste Resource Recovery31 MW33.2 km
Shady Hills Combined Cycle Facility—33.3 km
Shady Hills Generating Station541 MW33.3 km
Hernandoretired39.6 km