Abiquiu Dam

Rio Arriba County, New Mexico · EIA plant ID 7789 · Operator: Los Alamos County
HydroConventional HydroelectricBA: WACM
Nameplate16MWSummer 17 MW
Generators3in service
Net generation16GWh12 mo to Dec 2025
Capacity factor11%hydro units, summer MW
Heat rate—thermal plants only
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202510.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200232.927.2%—
200341.334.2%—
200421.117.4%—
200532.326.7%—
200627.122.4%—
200725.220.8%—
200851.442.4%—
200947.939.6%—
201041.134.0%—
201138.127.5%—
201243.329.3%—
20132617.7%—
201424.916.9%—
201513.79.3%—
201600.0%—
201750.934.5%—
201828.419.3%—
201919.713.4%—
202021.614.6%—
202119.713.4%—
202222.115.0%—
202346.531.6%—
202424.316.5%—
202515.710.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY6.36.9Apr 1989Operating—coming soon
2Conventional HydroelectricHY6.36.9Apr 1989Operating—coming soon
3Conventional HydroelectricHY33May 2011Operating—coming soon

Owner / operator

Operator: Los Alamos County. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Alamos County100.0%16 MW

Nearby plants

Within 80 km.
Syncarpha El Rito2 MW23.2 km
Alcalde Solar Array2 MW38.1 km
Los Alamos PV Site1 MW41.8 km
El Vado Dam8 MW48 km
Cuba 2.5ac, LLC3 MW53.1 km
Jicarilla Solar 250 MW68 km