← Back to map

Alcalde Solar Array

Rio Arriba County, New Mexico · EIA plant ID 63477 · Operator: Jemez Cuba LLC
SolarSolar PhotovoltaicBA: PNM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202020212022202320242025202628.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20204.121.2%—
20214.521.6%—
20226.229.7%—
2023628.4%—
20245.626.8%—
20255.928.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SOLARSolar PhotovoltaicPV2.42.4Feb 2020Operating—coming soon

Owner / operator

Operator: Jemez Cuba LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Jemez Cuba LLC100.0%2 MW

Nearby plants

Within 80 km.
Syncarpha El Rito2 MW29.9 km
Los Alamos PV Site1 MW34.1 km
Abiquiu Dam16 MW38.1 km
Syncarpha Taos3 MW46.2 km
Taos Mesa Energy Facility Hybrid28 MW54.1 km
Santa Fe Solar Energy Center10 MW56 km