← Back to map

Syncarpha El Rito

Rio Arriba County, New Mexico · EIA plant ID 63124 · Operator: Syncarpha El Rito I, LLC
SolarSolar PhotovoltaicBA: PNM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202624.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.15.1%—
20203.726.5%—
20213.826.8%—
20223.826.9%—
20233.827.0%—
20243.525.1%—
20253.524.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SYNELSolar PhotovoltaicPV1.61.6Dec 2019Operating—coming soon

Owner / operator

Operator: Syncarpha El Rito I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Syncarpha El Rito I, LLC100.0%2 MW

Nearby plants

Within 80 km.
Abiquiu Dam16 MW23.2 km
Alcalde Solar Array2 MW29.9 km
Syncarpha Taos3 MW47.7 km
Los Alamos PV Site1 MW51.9 km
Taos Mesa Energy Facility Hybrid28 MW52.4 km
El Vado Dam8 MW56.5 km