← Back to map

Los Alamos PV SiteOut of service

Los Alamos County, New Mexico · EIA plant ID 58256 · Operator: Los Alamos County
SolarSolar PhotovoltaicBA: PNM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Aug 2026
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2012

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600MWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%201220142016201820202022202420260.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2012268.3%—
20131.618.1%—
20141.517.5%—
2015111.7%—
20161.615.3%—
20170.917.3%—
20180.817.5%—
20190.817.2%—
20200.411.9%—
20210.69.4%—
20220.67.6%—
20230.55.5%—
20240.34.0%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Sep 2012Operating (Out of service)—coming soon
2BatteriesBA11Sep 2012Retired Nov 2019—coming soon
3BatteriesBA0.80.8Sep 2012Retired Nov 2019—coming soon

Owner / operator

Operator: Los Alamos County. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Alamos County100.0%1 MW

Nearby plants

Within 80 km.
Alcalde Solar Array2 MW34.1 km
Santa Fe Solar Energy Center10 MW39.1 km
Abiquiu Dam16 MW41.8 km
Syncarpha El Rito2 MW51.9 km
Juniper Sol Solar CSG5 MW52.1 km
Algodones45 MW56.4 km