El Vado Dam

Rio Arriba County, New Mexico · EIA plant ID 7593 · Operator: Los Alamos County
HydroConventional HydroelectricBA: WACM
Nameplate8MWSummer 8 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor6%hydro units, summer MW
Heat rate—thermal plants only
First online1988

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%200520102015202020256.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200232.946.9%—
200332.946.9%—
200424.935.5%—
200521.730.9%—
200625.937.0%—
200724.534.9%—
200843.261.5%—
200937.353.3%—
201035.350.4%—
201132.546.4%—
201227.238.7%—
201314.420.6%—
201400.0%—
201500.0%—
201600.0%—
201718.226.0%—
20181.62.3%—
201933.147.2%—
202013.919.9%—
20218.311.8%—
20223.14.4%—
20231.52.2%—
202400.0%—
20254.46.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY88May 1988Operating—coming soon

Owner / operator

Operator: Los Alamos County. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Alamos County100.0%8 MW

Nearby plants

Within 80 km.
Abiquiu Dam16 MW48 km
Syncarpha El Rito2 MW56.5 km
Jicarilla Solar 1 LLC70 MW57.6 km
Jicarilla Solar 250 MW63.8 km
Shallow Basket190 MW64.1 km
Cuba 2.5ac, LLC3 MW66.8 km