← Back to map

Shallow Basket

Rio Arriba County, New Mexico · EIA plant ID 68868 · Operator: Shallow Basket Energy, LLC
SolarBatteriesSolar PhotovoltaicBA: PNM
Nameplate190MWSummer 190 MW
Generators2in service
Net generation382GWh12 mo to Aug 2026
Capacity factor32%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202731.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202513727.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SBBS1BatteriesBA5050Aug 2025Operating—coming soon
SBPV1Solar PhotovoltaicPV140140Aug 2025Operating—coming soon

Owner / operator

Operator: Shallow Basket Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Shallow Basket Energy, LLC100.0%190 MW

Nearby plants

Within 80 km.
Jicarilla Solar 1 LLC70 MW7.8 km
Jicarilla Solar 250 MW17.6 km
Arroyo Solar Energy Storage Hybrid450 MW38.7 km
Cuba 2.5ac, LLC3 MW41.9 km
El Vado Dam8 MW64.1 km
Navajo Dam30 MW67.3 km