McKinley County, New Mexico · EIA plant ID 63172 · Operator: Arroyo Solar LLC
SolarBatteriesSolar PhotovoltaicBA: PNM
Nameplate450MWSummer 450 MW
Generators2in service
Net generation735GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202728.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023149.3——
2024700.327.3%—
202567926.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ARESSBatteriesBA150150Jul 2023Operating—coming soon
ARSOLSolar PhotovoltaicPV300300Jan 2024Operating—coming soon

Owner / operator

Operator: Arroyo Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arroyo Solar LLC100.0%450 MW

Nearby plants

Within 80 km.
Shallow Basket190 MW38.7 km
Jicarilla Solar 250 MW40 km
Jicarilla Solar 1 LLC70 MW46.3 km
Cuba 2.5ac, LLC3 MW55.8 km
Escalanteretired77.4 km
Escalante (NM)200 MW78.1 km