← Back to map

Jicarilla Solar 2

Rio Arriba County, New Mexico · EIA plant ID 65103 · Operator: Repsol Renewables NA
SolarSolar PhotovoltaicBA: PNM
Nameplate50MWSummer 50 MW
Generators1in service
Net generation130GWh12 mo to Aug 2026
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202729.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022108.6——
2023132.540.2%—
2024118.627.0%—
2025127.629.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
JICS2Solar PhotovoltaicPV5050Apr 2023Operating—coming soon

Owner / operator

Operator: Repsol Renewables NA. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Repsol Renewables NA100.0%50 MW

Nearby plants

Within 80 km.
Shallow Basket190 MW17.6 km
Jicarilla Solar 1 LLC70 MW21.7 km
Cuba 2.5ac, LLC3 MW24.5 km
Arroyo Solar Energy Storage Hybrid450 MW40 km
El Vado Dam8 MW63.8 km
Abiquiu Dam16 MW68 km