← Back to map

Southern Bighorn Solar 2Planned

Clark County, Nevada · EIA plant ID 69762 · Operator: 425LM 8ME LLC
SolarBA: NEVP

200 MW planned (Batteries, Solar Photovoltaic), first expected Jul 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
425LMSolar PhotovoltaicPV100100planned Jul 2028Planned—coming soon
BESS2BatteriesBA100100planned Jul 2028Planned—coming soon

Owner / operator

Operator: 425LM 8ME LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Moapa Southern Paiute250 MW4.3 km
Eagle Shadow Mountain Solar Farm300 MW9.2 km
Gemini Solar Hybrid1,070 MW11.9 km
Reid Gardner220 MW14.4 km
Arrow Canyon Solar Hybrid275 MW14.6 km
Dry Lake Solar Energy Center250 MW20 km