← Back to map

Eagle Shadow Mountain Solar Farm

Clark County, Nevada · EIA plant ID 61852 · Operator: 325MK 8me LLC
SolarSolar PhotovoltaicBA: NEVP
Nameplate300MWSummer 300 MW
Generators1in service
Net generation901GWh12 mo to Aug 2026
Capacity factor34%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202734.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202131.3——
2022729.6——
2023856.648.6%—
2024908.934.5%—
2025901.434.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESMSFSolar PhotovoltaicPV300300May 2023Operating—coming soon

Owner / operator

Operator: 325MK 8me LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
325MK 8me LLC100.0%300 MW

Nearby plants

Within 80 km.
Reid Gardner220 MW5.5 km
Southern Bighorn Solar 2—9.2 km
Moapa Southern Paiute250 MW13.5 km
Gemini Solar Hybrid1,070 MW21 km
Arrow Canyon Solar Hybrid275 MW23.8 km
Dry Lake Solar Energy Center250 MW29.1 km