Moapa Southern Paiute
Clark County, Nevada · EIA plant ID 57859 · Operator: CD Arevon USA, Inc.
Nameplate250MWSummer 250 MW
Generators1in service
Net generation607GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2016
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 77.1 | 41.5% | — |
| 2017 | 628.6 | 28.7% | — |
| 2018 | 624.5 | 28.5% | — |
| 2019 | 599.7 | 27.4% | — |
| 2020 | 630.1 | 28.7% | — |
| 2021 | 606.1 | 27.7% | — |
| 2022 | 636.1 | 29.0% | — |
| 2023 | 590 | 26.9% | — |
| 2024 | 614.7 | 28.0% | — |
| 2025 | 611.7 | 27.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 250 | 250 | Dec 2016 | Operating | — | coming soon |
| 2 | Solar Photovoltaic | PV | 150 | 150 | planned Dec 2014 | not_current | — | coming soon |
Owner / operator
Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Moapa Southern Paiute LLC | 65.0% | 163 MW |
| Goldman Sachs/General Electric | 35.0% | 88 MW |
Nearby plants
Within 80 km.
| Southern Bighorn Solar 2 | — | 4.3 km |
| Gemini Solar Hybrid | 1,070 MW | 7.6 km |
| Arrow Canyon Solar Hybrid | 275 MW | 10.3 km |
| Eagle Shadow Mountain Solar Farm | 300 MW | 13.5 km |
| Dry Lake Solar Energy Center | 250 MW | 15.7 km |
| Harry Allen | 745 MW | 16.2 km |