Arrow Canyon Solar Hybrid
Clark County, Nevada · EIA plant ID 62248 · Operator: Arrow Canyon Solar LLC
Nameplate275MWSummer 275 MW
Generators2in service
Net generation600GWh12 mo to Aug 2026
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 29.3 | — | — |
| 2023 | 630.2 | 424.1% | — |
| 2024 | 599.6 | 34.9% | — |
| 2025 | 595.1 | 34.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 200 | 200 | Dec 2023 | Operating | — | coming soon |
| 2 | Batteries | BA | 75 | 75 | Dec 2023 | Operating | — | coming soon |
Owner / operator
Operator: Arrow Canyon Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Arrow Canyon Solar LLC | 100.0% | 275 MW |
Nearby plants
Within 80 km.
| Gemini Solar Hybrid | 1,070 MW | 3.6 km |
| Dry Lake Solar Energy Center | 250 MW | 5.5 km |
| Harry Allen | 745 MW | 6.1 km |
| Dry Lake East Energy Center | — | 6.7 km |
| Playa Solar 2 | 100 MW | 8.1 km |
| Playa Solar 1, LLC | 79 MW | 8.1 km |