← Back to map

Arrow Canyon Solar Hybrid

Clark County, Nevada · EIA plant ID 62248 · Operator: Arrow Canyon Solar LLC
SolarBatteriesSolar PhotovoltaicBA: NEVP
Nameplate275MWSummer 275 MW
Generators2in service
Net generation600GWh12 mo to Aug 2026
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%200%400%2023202420252026202735.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202229.3——
2023630.2424.1%—
2024599.634.9%—
2025595.134.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV200200Dec 2023Operating—coming soon
2BatteriesBA7575Dec 2023Operating—coming soon

Owner / operator

Operator: Arrow Canyon Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arrow Canyon Solar LLC100.0%275 MW

Nearby plants

Within 80 km.
Gemini Solar Hybrid1,070 MW3.6 km
Dry Lake Solar Energy Center250 MW5.5 km
Harry Allen745 MW6.1 km
Dry Lake East Energy Center—6.7 km
Playa Solar 2100 MW8.1 km
Playa Solar 1, LLC79 MW8.1 km