← Back to map

Playa Solar 2

Clark County, Nevada · EIA plant ID 60261 · Operator: EDF Renewable Asset Holdings, Inc.
SolarSolar PhotovoltaicBA: NEVP
Nameplate100MWSummer 100 MW
Generators1in service
Net generation253GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202628.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201764.917.7%—
2018295.233.7%—
2019289.333.0%—
2020289.533.0%—
2021284.832.5%—
2022283.132.3%—
2023253.228.9%—
2024246.928.1%—
2025255.129.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV100100Aug 2017Operating—coming soon

Owner / operator

Operator: EDF Renewable Asset Holdings, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EDF Renewable Asset Holdings, Inc.100.0%100 MW

Nearby plants

Within 80 km.
Playa Solar 1, LLC79 MW0 km
Harry Allen745 MW2.6 km
Dry Lake Solar Energy Center250 MW2.6 km
Vitex Storage—2.9 km
Chuck Lenzie Generating Station1,466 MW3 km
Dry Lake East Energy Center—3.9 km