← Back to map

Desert Sky

Pecos County, Texas · EIA plant ID 55992 · Operator: Desert Sky Wind Farm LP
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate168MWSummer 168 MW
Generators1in service
Net generation541GWh12 mo to Dec 2025
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2002

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh200220042006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202536.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2002360.625.7%—
2003373.226.5%—
2004397.628.2%—
2005468.233.3%—
2006488.534.7%—
2007484.534.5%—
200847233.5%—
2009381.127.1%—
2010512.436.4%—
2011491.635.0%—
2012446.131.6%—
2013459.432.7%—
2014503.635.8%—
2015439.331.2%—
2016420.529.8%—
2017400.928.5%—
2018422.828.8%—
2019528.736.0%—
2020539.436.6%—
2021559.138.1%—
2022482.332.8%—
2023462.331.5%—
2024496.733.7%—
2025541.236.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT167.7167.7Jan 2002Operating—ge 1.5 S

Owner / operator

Operator: Desert Sky Wind Farm LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Desert Sky Wind Farm LP100.0%168 MW

Nearby plants

Within 80 km.
NWP Indian Mesa Wind Farm83 MW11 km
Greenalia Solar Power Blackwelder Ranch—15.1 km
Blackwelder Ranch Wind—15.1 km
Midway Solar - TX182 MW15.6 km
RE Maplewood250 MW17.6 km
Pearl Solar50 MW19 km