← Back to map

RE Maplewood

Pecos County, Texas · EIA plant ID 61346 · Operator: Novatus Energy
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate250MWSummer 250 MW
Generators2in service
Net generation530GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202120222023202420252026202724.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021263.839.1%—
2022538.924.6%—
2023462.721.1%—
202456125.6%—
2025526.424.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV222222Oct 2021Operating—coming soon
PV2Solar PhotovoltaicPV2828Apr 2021Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%250 MW

Nearby plants

Within 80 km.
Pearl Solar50 MW1.6 km
Alamo 6105 MW2.2 km
Hydra200 MW3.5 km
East Pecos Solar119 MW3.5 km
Midway Solar - TX182 MW3.9 km
NWP Indian Mesa Wind Farm83 MW7.4 km