← Back to map

Pearl Solar

Pecos County, Texas · EIA plant ID 60682 · Operator: BHE Renewables, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate50MWSummer 50 MW
Generators1in service
Net generation86GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202619.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201733.330.1%—
2018110.425.2%—
2019104.323.8%—
2020100.422.9%—
202184.419.3%—
2022105.224.0%—
20239521.7%—
2024101.223.1%—
202597.422.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PEARLSolar PhotovoltaicPV5050Oct 2017Operating—coming soon

Owner / operator

Operator: BHE Renewables, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BHE Renewables, LLC100.0%50 MW

Nearby plants

Within 80 km.
Alamo 6105 MW0.6 km
RE Maplewood250 MW1.6 km
East Pecos Solar119 MW1.9 km
Hydra200 MW2.1 km
Midway Solar - TX182 MW4.4 km
NWP Indian Mesa Wind Farm83 MW8.9 km