← Back to map

Midway Solar - TX

Pecos County, Texas · EIA plant ID 61368 · Operator: d e shaw & co., lp
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate182MWSummer 182 MW
Generators1in service
Net generation305GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202619.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20189.46.9%—
2019333.620.9%—
2020384.424.1%—
2021354.622.2%—
2022280.917.6%—
2023287.418.0%—
2024316.719.8%—
2025332.520.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV182182Dec 2018Operating—coming soon

Owner / operator

Operator: d e shaw & co., lp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
174 Power Global Corp.100.0%182 MW

Nearby plants

Within 80 km.
RE Maplewood250 MW3.9 km
Pearl Solar50 MW4.4 km
Alamo 6105 MW4.5 km
East Pecos Solar119 MW5.6 km
Hydra200 MW6.3 km
NWP Indian Mesa Wind Farm83 MW7.4 km