← Back to map

East Pecos Solar

Pecos County, Texas · EIA plant ID 60436 · Operator: Southern Power Co
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate119MWSummer 119 MW
Generators1in service
Net generation238GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202622.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2017241.730.9%—
2018294.428.4%—
201929128.0%—
2020297.328.6%—
2021285.527.5%—
2022275.626.6%—
202326725.7%—
2024247.423.8%—
2025219.421.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV118.5118.5Apr 2017Operating—coming soon

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
East Pecos Solar, LLC100.0%119 MW

Nearby plants

Within 80 km.
Hydra200 MW1.2 km
Alamo 6105 MW1.4 km
Pearl Solar50 MW1.9 km
RE Maplewood250 MW3.5 km
Midway Solar - TX182 MW5.6 km
NWP Indian Mesa Wind Farm83 MW10.9 km