Blackwelder Ranch WindPlanned
Pecos County, Texas · EIA plant ID 68768 · Operator: Greenalia Wind Power Blackwelder Ranch, LLC
110 MW planned (Onshore Wind Turbine), first expected Jun 2030 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRGWP | Onshore Wind Turbine | WT | 110.4 | 110.4 | planned Jun 2030 | Planned | — | coming soon |
Owner / operator
Operator: Greenalia Wind Power Blackwelder Ranch, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Greenalia Solar Power Blackwelder Ranch | — | 0 km |
| NWP Indian Mesa Wind Farm | 83 MW | 13.3 km |
| Desert Sky | 168 MW | 15.1 km |
| Sherbino I Wind Farm | retired | 16.2 km |
| RE Maplewood | 250 MW | 19.5 km |
| Midway Solar - TX | 182 MW | 20.6 km |