Greenalia Solar Power Blackwelder RanchPlanned

Pecos County, Texas · EIA plant ID 68767 · Operator: Greenalia Solar Power Blackwelder Ranch, LLC
SolarERCOTBA: ERCO

200 MW planned (Solar Photovoltaic), first expected Jun 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRGSPSolar PhotovoltaicPV199.7199.7planned Jun 2030Planned—coming soon

Owner / operator

Operator: Greenalia Solar Power Blackwelder Ranch, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Blackwelder Ranch Wind—0 km
NWP Indian Mesa Wind Farm83 MW13.3 km
Desert Sky168 MW15.1 km
Sherbino I Wind Farmretired16.2 km
RE Maplewood250 MW19.5 km
Midway Solar - TX182 MW20.6 km