Lockhart ESS, LLC

San Bernardino County, California · EIA plant ID 66946 · Operator: Terra-Gen Operating Co-Solar
BatteryBatteriesCAISOBA: CISO
Nameplate45MWSummer 45 MW
Generators1in service
Net generation-10GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1,000-800-600-400-2000MWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-4.7——
2025-9.2——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LHESSBatteriesBA4545Jul 2024Operating—coming soon

Owner / operator

Operator: Terra-Gen Operating Co-Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terra-Gen Operating Co-Solar100.0%45 MW

Nearby plants

Within 80 km.
SEGS VIII169 MW0.2 km
Desert Breeze Solar, LLC125 MW1 km
Lockhart Solar PV II144 MW1.4 km
SEGS IXretired1.7 km
Lockhart Solar PV IV, LLC80 MW1.7 km
Overnight Solar—1.8 km