Lockhart Solar PV IV, LLC
San Bernardino County, California · EIA plant ID 67510 · Operator: Terra-Gen Operating Co-Solar
Nameplate80MWSummer 80 MW
Generators1in service
Net generation79GWh12 mo to Aug 2026
Capacity factor66%solar units, summer MW
Heat rate—thermal plants only
First online2026
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LOC4 | Solar Photovoltaic | PV | 80 | 80 | Jul 2026 | Operating | — | coming soon |
Owner / operator
Operator: Terra-Gen Operating Co-Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Terra-Gen Operating Co-Solar | 100.0% | 80 MW |
Nearby plants
Within 80 km.
| SEGS IX | retired | 0.1 km |
| Desert Breeze Solar, LLC | 125 MW | 1.1 km |
| Mojave Solar Project | 280 MW | 1.6 km |
| Lockhart Solar PV II | 144 MW | 1.6 km |
| SEGS VIII | 169 MW | 1.7 km |
| Lockhart ESS, LLC | 45 MW | 1.7 km |