Lockhart Solar PV II

San Bernardino County, California · EIA plant ID 66699 · Operator: Terra-Gen Operating Co-Solar
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate144MWSummer 135 MW
Generators2in service
Net generation196GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202731.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202397.329.4%—
2024185.628.2%—
2025204.231.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LHC2BatteriesBA59.759.7Nov 2025Operating—coming soon
LOC2Solar PhotovoltaicPV84.475Jul 2023Operating—coming soon

Owner / operator

Operator: Terra-Gen Operating Co-Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terra-Gen Operating Co-Solar100.0%144 MW

Nearby plants

Within 80 km.
Desert Breeze Solar, LLC125 MW0.7 km
Lockhart ESS, LLC45 MW1.4 km
SEGS IXretired1.5 km
SEGS VIII169 MW1.6 km
Lockhart Solar PV IV, LLC80 MW1.6 km
Mojave Solar Project280 MW3 km