×92 MW solar retired since 2020 (latest Oct 2021)

Nameplate169MWSummer 154 MW
Generators2in service
Net generation230GWh12 mo to Aug 2026
Capacity factor33%solar units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh200120032005200720092011201320152017201920212025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202532.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,00014,00016,0002005201020152020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001178.117.0%—
2002177.717.3%—
2003165.817.0%13,728
2004155.417.7%13,636
2005138.715.6%13,631
2006141.515.2%14,143
2007146.515.9%14,671
2008151.917.5%14,880
200918717.1%14,305
2010219.720.2%13,834
201121419.8%13,873
2012202.118.8%13,729
201315818.3%13,427
201415918.9%13,345
2015157.217.9%14,056
2016156.318.2%14,074
2017143.816.0%14,491
2018148.317.2%14,053
2019137.515.6%13,840
2020114.914.8%16,629
202181.715.6%—
2023100.826.9%—
2024224.530.1%—
2025240.332.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LHC1BatteriesBA6969Nov 2025Operating—coming soon
LOC1Solar PhotovoltaicPV100.485Jul 2023Operating—coming soon
GEN1Solar Thermal without Energy StorageST9280Dec 1989Retired Oct 2021—coming soon

Owner / operator

Operator: Terra-Gen Operating Co-Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terra-Gen Operating Co-Solar100.0%169 MW

Nearby plants

Within 80 km.
Lockhart ESS, LLC45 MW0.2 km
Desert Breeze Solar, LLC125 MW1.1 km
Lockhart Solar PV II144 MW1.6 km
Overnight Solar—1.6 km
Lockhart Solar PV IV, LLC80 MW1.7 km
SEGS IXretired1.7 km