Overnight SolarUnder construction

San Bernardino County, California · EIA plant ID 68932 · Operator: Overnight Solar LLC
BatteryCAISOBA: CISO

300 MW under construction (Batteries, Solar Photovoltaic), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 300 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OSBABatteriesBA150150planned Jan 2027Under construction—coming soon
OSPVSolar PhotovoltaicPV150150planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Overnight Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
SEGS VIII169 MW1.6 km
Mojave Solar Project280 MW1.6 km
Lockhart ESS, LLC45 MW1.8 km
Lockhart Solar PV IV, LLC80 MW2.5 km
SEGS IXretired2.5 km
Desert Breeze Solar, LLC125 MW2.6 km