← Back to map

Golden Triangle II

Lowndes County, Mississippi · EIA plant ID 65291 · Operator: Origis Energy USA, Inc
SolarBatteriesSolar PhotovoltaicBA: TVA
Nameplate200MWSummer 200 MW
Generators2in service
Net generation304GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202723.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202420123.2%—
2025319.324.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MS6_SBatteriesBA5050May 2024Operating—coming soon
OEMS6Solar PhotovoltaicPV150150May 2024Operating—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Origis Energy USA, Inc100.0%200 MW

Nearby plants

Within 80 km.
Golden Triangle250 MW0.5 km
Columbus MS129 MW16.3 km
Mississippi State University26 MW17.1 km
Optimist250 MW25.5 km
New Caledonia—38.6 km
Caledonia801 MW41.4 km