← Back to map

Golden Triangle

Lowndes County, Mississippi · EIA plant ID 64529 · Operator: Origis Energy USA, Inc
SolarBatteriesSolar PhotovoltaicBA: TVA
Nameplate250MWSummer 250 MW
Generators2in service
Net generation410GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202723.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025411.823.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MS5_SBatteriesBA5050Jan 2025Operating—coming soon
OEMS5Solar PhotovoltaicPV200200Jan 2025Operating—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Origis Energy USA, Inc100.0%250 MW

Nearby plants

Within 80 km.
Golden Triangle II200 MW0.5 km
Columbus MS129 MW16.1 km
Mississippi State University26 MW17.4 km
Optimist250 MW25.1 km
New Caledonia—38.1 km
Caledonia801 MW40.9 km