New CaledoniaPlanned
Lowndes County, Mississippi · EIA plant ID 69147 · Operator: Tennessee Valley Authority
504 MW planned (Natural Gas Fired Combustion Turbine), first expected Dec 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| G1 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
| G2 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
| G3 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
| G4 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
| G5 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
| G6 | Natural Gas Fired Combustion Turbine | GT | 84 | 81 | planned Dec 2028 | Planned | — | coming soon |
Owner / operator
Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Caledonia | 801 MW | 4 km |
| Optimist | 250 MW | 25.9 km |
| Columbus MS | 129 MW | 34.9 km |
| Golden Triangle | 250 MW | 38.1 km |
| Golden Triangle II | 200 MW | 38.6 km |
| SR Magnolia | — | 40.5 km |