← Back to map

Mississippi State University

Oktibbeha County, Mississippi · EIA plant ID 68899 · Operator: Mississippi State University
Natural gasNatural Gas Fired Combustion TurbineBA: TVA
Nameplate26MWSummer 26 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2005

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas26
Net summer MW on oil26
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT1313Mar 2005Operating—coming soon
2Natural Gas Fired Combustion TurbineGT1313Mar 2005Operating—coming soon

Owner / operator

Operator: Mississippi State University. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Mississippi State University100.0%26 MW

Nearby plants

Within 80 km.
Golden Triangle II200 MW17.1 km
Golden Triangle250 MW17.4 km
Optimist250 MW28.7 km
Columbus MS129 MW33.3 km
Quantum Choctaw Power LLC851 MW38.7 km
Red Hills Generating Facility514 MW39.6 km