Big Rock Solar Farm

Imperial County, California · EIA plant ID 64636 · Operator: 92JT 8me, LLC
BatteryBatteriesCAISOBA: CISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation-28GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-3-2-10GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025-14.6——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
92JTBBatteriesBA200200May 2025Operating—coming soon

Owner / operator

Operator: 92JT 8me, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
92JT 8me, LLC100.0%200 MW

Nearby plants

Within 80 km.
CED West Side Canal Battery Storage131 MW0.6 km
Kingsley Solar Farm—2.2 km
Campo Verde Solar147 MW2.5 km
Drew Solar LLC100 MW6.8 km
LeConte Energy Storage125 MW7.5 km
Imperial Solar Energy Center West149 MW7.5 km