← Back to map

Drew Solar LLC

Imperial County, California · EIA plant ID 63127 · Operator: Drew Solar LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate100MWSummer 100 MW
Generators1in service
Net generation304GWh12 mo to Aug 2026
Capacity factor35%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20222023202420252026202734.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20224027.3%—
202329433.6%—
2024310.535.4%—
2025308.335.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DSSolar PhotovoltaicPV100100Nov 2022Operating—coming soon

Owner / operator

Operator: Drew Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Drew Solar LLC100.0%100 MW

Nearby plants

Within 80 km.
LeConte Energy Storage125 MW1.2 km
Centinela Solar Energy175 MW1.7 km
Imperial Solar Energy Center South129 MW2.7 km
Mount Signal Solar Farm II154 MW4 km
Wistaria Ranch Solar107 MW4.5 km
CED West Side Canal Battery Storage131 MW6.8 km