← Back to map

Wistaria Ranch Solar

Imperial County, California · EIA plant ID 61750 · Operator: RWE Clean Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate107MWSummer 100 MW
Generators1in service
Net generation268GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202630.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201815.420.7%—
2019292.633.4%—
2020269.830.7%—
2021258.829.5%—
2022252.828.9%—
2023273.131.2%—
202429233.2%—
2025288.933.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WICASolar PhotovoltaicPV106.7100Dec 2018Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%107 MW

Nearby plants

Within 80 km.
Mount Signal Solar Farm II154 MW1.3 km
Centinela Solar Energy175 MW3 km
Imperial Valley Solar, LLC200 MW3 km
Imperial Solar Energy Center South129 MW3.9 km
Drew Solar LLC100 MW4.5 km
LeConte Energy Storage125 MW4.8 km