← Back to map

Mount Signal Solar Farm II

Imperial County, California · EIA plant ID 61353 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate154MWSummer 154 MW
Generators1in service
Net generation355GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202726.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201932.3——
2020416.930.9%—
2021384.228.6%—
2022358.926.7%—
2023297.722.1%—
2024408.430.3%—
2025402.529.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IVS2Solar PhotovoltaicPV153.5153.5Jan 2020Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Imperial Valley Solar 2, LLC100.0%154 MW

Nearby plants

Within 80 km.
Wistaria Ranch Solar107 MW1.3 km
Centinela Solar Energy175 MW2.7 km
Imperial Solar Energy Center South129 MW2.8 km
Imperial Valley Solar, LLC200 MW3.9 km
LeConte Energy Storage125 MW4 km
Drew Solar LLC100 MW4 km