Kingsley Solar FarmPlanned
Imperial County, California · EIA plant ID 64634 · Operator: 90FI 8me, LLC
299 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 90FI8 | Solar Photovoltaic | PV | 225 | 225 | planned Dec 2028 | Planned | — | coming soon |
| 90FIB | Batteries | BA | 74 | 74 | planned Dec 2028 | Planned | — | coming soon |
Owner / operator
Operator: 90FI 8me, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Campo Verde Solar | 147 MW | 1.5 km |
| CED West Side Canal Battery Storage | 131 MW | 2.1 km |
| Big Rock Solar Farm | 200 MW | 2.2 km |
| Imperial Solar Energy Center West | 149 MW | 5.3 km |
| SEPV Imperial Dixieland East | 2 MW | 6.6 km |
| SEPV Imperial Dixieland West | 3 MW | 7.1 km |