Kingsley Solar FarmPlanned

Imperial County, California · EIA plant ID 64634 · Operator: 90FI 8me, LLC
SolarCAISOBA: CISO

299 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
90FI8Solar PhotovoltaicPV225225planned Dec 2028Planned—coming soon
90FIBBatteriesBA7474planned Dec 2028Planned—coming soon

Owner / operator

Operator: 90FI 8me, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Campo Verde Solar147 MW1.5 km
CED West Side Canal Battery Storage131 MW2.1 km
Big Rock Solar Farm200 MW2.2 km
Imperial Solar Energy Center West149 MW5.3 km
SEPV Imperial Dixieland East2 MW6.6 km
SEPV Imperial Dixieland West3 MW7.1 km