SEPV Imperial Dixieland East

Imperial County, California · EIA plant ID 60745 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: IID
Nameplate2MWSummer 2 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor32%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202632.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.16.3%—
20175.633.5%—
20185.734.1%—
20195.834.9%—
20205.633.8%—
20215.633.5%—
20225.331.8%—
20235.331.9%—
20244.225.3%—
20255.332.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SESI1Solar PhotovoltaicPV21.9Dec 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
SEPV Imperial Dixieland West3 MW0.6 km
Imperial Solar Energy Center West149 MW2.3 km
Centinela State Prison6 MW3.9 km
Campo Verde Solar147 MW6.2 km
Kingsley Solar Farm—6.6 km
USG 11 MW7.8 km