Campo Verde Solar

Imperial County, California · EIA plant ID 58467 · Operator: Southern Power Co
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate147MWSummer 139 MW
Generators1in service
Net generation293GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202624.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201377.425.2%—
2014371.330.5%—
2015368.930.3%—
2016362.329.7%—
2017351.528.9%—
2018326.526.8%—
2019335.827.6%—
2020335.327.5%—
2021345.628.4%—
2022349.228.7%—
2023328.627.0%—
2024294.724.1%—
2025292.724.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CVS1Solar PhotovoltaicPV147.4139Oct 2013Operating—coming soon

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Campo Verde Solar, LLC100.0%147 MW

Nearby plants

Within 80 km.
Kingsley Solar Farm—1.5 km
Big Rock Solar Farm200 MW2.5 km
CED West Side Canal Battery Storage131 MW2.8 km
Imperial Solar Energy Center West149 MW5.4 km
SEPV Imperial Dixieland East2 MW6.2 km
SEPV Imperial Dixieland West3 MW6.7 km