Mendon

Worcester County, Massachusetts · EIA plant ID 64575 · Operator: BWC Box Pond LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202020212022202320242025202615.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20204.117.7%—
20213.816.9%—
20223.816.8%—
20233.917.3%—
20243.816.7%—
20253.415.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2.62.6Dec 2017Operating—coming soon

Owner / operator

Operator: BWC Box Pond LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BWC Box Pond LLC100.0%3 MW

Nearby plants

Within 80 km.
BWC Muddy Brook, LLC Hybrid2 MW0.3 km
BWC Origination 191 MW1.5 km
Bellingham Cogeneration Facility386 MW1.6 km
Kearsarge William Way7 MW1.9 km
BWC Wading River One, Two, Three CSG3 MW2.5 km
Milford Power LP249 MW3.6 km