← Back to map

BWC Wading River One, Two, Three CSG

Worcester County, Massachusetts · EIA plant ID 61069 · Operator: Ameresco BWC Wading River LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201820202022202420266.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.49.2%—
20184.617.4%—
20194.918.5%—
20205.119.5%—
20214.918.5%—
20225.320.1%—
20234.818.4%—
2024519.1%—
20251.66.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
62381Solar PhotovoltaicPV33Nov 2017Operating—coming soon

Owner / operator

Operator: Ameresco BWC Wading River LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ameresco BWC Wading River LLC100.0%3 MW

Nearby plants

Within 80 km.
BWC Muddy Brook, LLC Hybrid2 MW2.2 km
Mendon3 MW2.5 km
Kearsarge William Way7 MW2.8 km
ANP Blackstone Energy Project578 MW3 km
BWC Origination 191 MW3.3 km
Bellingham Cogeneration Facility386 MW3.7 km