← Back to map

BWC Muddy Brook, LLC Hybrid

Worcester County, Massachusetts · EIA plant ID 64170 · Operator: AES Distributed Energy
SolarBatteriesSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202621.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20210.11.9%—
20221.922.0%—
20231.618.4%—
20241.921.9%—
20251.921.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MBESBatteriesBA0.90.9Sep 2021Operating—coming soon
MBPVSolar PhotovoltaicPV11Sep 2021Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Mendon3 MW0.3 km
BWC Origination 191 MW1.6 km
Bellingham Cogeneration Facility386 MW1.9 km
Kearsarge William Way7 MW2 km
BWC Wading River One, Two, Three CSG3 MW2.2 km
Milford Power LP249 MW3.7 km