Milford Power LP

Worcester County, Massachusetts · EIA plant ID 54805 · Operator: Milford Power Ltd Partnership
Natural gasNatural Gas Fired Combined CycleISONEBA: ISNE
Nameplate249MWSummer 205 MW
Generators2in service
Net generation253GWh12 mo to Dec 2025
Capacity factor14%gas/coal/oil units, summer MW
Heat rate8,594Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202514.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,5008,0008,5009,000200520102015202020258,594 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001698.1——
2002503.2——
2003270.720.9%8,284
200470.65.4%8,297
2005203.415.7%8,531
2006259.520.0%8,544
2007218.116.8%8,307
2008140.410.8%8,894
200921516.6%8,208
2010403.231.1%8,498
2011213.416.5%8,544
2012393.330.3%8,428
2013211.816.3%8,306
2014465.735.9%8,371
2015484.237.4%8,234
201693.27.2%8,529
2017222.917.2%8,424
2018250.918.9%8,594
2019212.111.8%8,814
2020200.411.1%8,819
2021251.814.0%8,698
2022147.28.2%8,882
2023210.311.7%8,798
2024253.114.1%7,850
2025253.314.1%8,594

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT-1Natural Gas Fired Combined CycleCT128.9123Mar 1993Operating—coming soon
ST-1Natural Gas Fired Combined CycleCA120.481.8Mar 1993Operating—coming soon

Owner / operator

Operator: Milford Power Ltd Partnership. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EGCO Tower50.0%125 MW
Jera Energy America, LLC50.0%125 MW

Nearby plants

Within 80 km.
BWC Origination 191 MW2.1 km
BWC Mystic River1 MW3.6 km
Mendon3 MW3.6 km
BWC Muddy Brook, LLC Hybrid2 MW3.7 km
Bellingham Cogeneration Facility386 MW4.7 km
BWC Wading River One, Two, Three CSG3 MW5.1 km