CalCity Solar 1

Kern County, California · EIA plant ID 63054 · Operator: CalCity Solar 1 , LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202630.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.613.5%—
20208.130.8%—
20217.829.8%—
20227.227.4%—
20237.428.2%—
20247.930.2%—
2025830.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CALTRSolar PhotovoltaicPV33Nov 2019Operating—coming soon

Owner / operator

Operator: CalCity Solar 1 , LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CalCity Solar 1 , LLC100.0%3 MW

Nearby plants

Within 80 km.
California City2 MW2.2 km
Springbok 3 Solar Farm Hybrid92 MW4.6 km
Eland Solar & Storage Center, Phase 2 Hy458 MW8.4 km
Eland Solar & Storage Center, Phase 1 Hy460 MW9.2 km
RE Barren Ridge 160 MW11.7 km
Springbok Solar Farm 1105 MW12 km