Kern County, California · EIA plant ID 60389 · Operator: RE Barren Ridge 1, LLC
SolarSolar PhotovoltaicBA: LDWP
Nameplate60MWSummer 60 MW
Generators1in service
Net generation164GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202631.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201692.141.8%—
201717833.9%—
2018177.133.7%—
2019163.431.1%—
2020168.632.0%—
2021171.332.6%—
2022169.332.2%—
2023169.532.3%—
202417533.2%—
2025164.431.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
REBR1Solar PhotovoltaicPV6060Aug 2016Operating—coming soon

Owner / operator

Operator: RE Barren Ridge 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE Barren Ridge 1, LLC100.0%60 MW

Nearby plants

Within 80 km.
Beacon Solar Plant Site 538 MW5.8 km
Hecate Energy Beacon Solar 450 MW6.6 km
Beacon BESS 120 MW6.9 km
Springbok 3 Solar Farm Hybrid92 MW7.1 km
Hecate Energy Beacon Solar 356 MW7.3 km
Eland Solar & Storage Center, Phase 2 Hy458 MW8.4 km