← Back to map

Hecate Energy Beacon Solar 3

Kern County, California · EIA plant ID 59316 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: LDWP
Nameplate56MWSummer 51 MW
Generators1in service
Net generation115GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202625.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201637.2%—
201713226.9%—
201814332.0%—
2019138.230.9%—
2020138.430.9%—
2021139.531.2%—
202214131.6%—
2023134.430.1%—
2024132.229.5%—
2025122.127.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BEAC3Solar PhotovoltaicPV5651Dec 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%56 MW

Nearby plants

Within 80 km.
Hecate Energy Beacon Solar 450 MW1.1 km
Beacon BESS 120 MW1.2 km
Hecate Energy Beacon Solar 156 MW1.8 km
Beacon Solar Plant Site 538 MW1.8 km
Beacon Solar Plant Site 247 MW2 km
Springbok Solar Farm 2155 MW3.5 km